CO129-093 - Acting Governor Mercer - 1863 [7-10] — Page 159

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

SURVEYOR GENERAL'S

of Victoria, Hong Kong, with estimate of the expense for extending and completing the water service for providing the city with water.

$ 35,322.01

Victoria, 27th July, 1863.

REPORT AND ESTIMATE

Supplementary

No. of 1863.

Hong Kong, 15th April 1863.

I have the honour to Report on the Water Works as follows:

The Reservoir, Watchman's House and Stop-cock Vault, at Pokfulam are complete. The extra works performed at this station are principally accounted for by the fact that the waste weir of the dam as originally constructed was too small to carry the waste water in cases of very heavy rains, and it was therefore deemed necessary to lay the whole surface of the top of the dam with granite, and to build on top of that high skirting walls to allow the waste to pass off freely without the probability of doing any damage in future.

The Tank above Bonham Road may be said to be complete with the exception of asphalting the bottom, the fixing of ventilators and sink stones in the crowns of the covering arches, and the fitting of doors and windows to the small houses in front.

The Tank above Taipingshan is also completed with a capacity of 850,000 Gallons, with the exception of cementing and asphalting the bottom, the fixing of ventilators and sink stones in the crowns of the covering arches, and the fitting of doors and windows to the top lock House and Workshops in front.

The extra works on the site of the upper Tank were unavoidable, as the site originally proposed was not suitable, and it was found necessary to build a considerable quantity of extra retaining and other walls.

Page 158

Edit History

2026-05-19 00:38:26 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
SURVEYOR GENERAL'S of Victoria, Hong Kong, with estimate of the expense for extending and completing the water service for providing the city with water. $ 35,322.01 Victoria, 27th July, 1863. REPORT AND ESTIMATE Supplementary No. of 1863. Hong Kong, 15th April 1863. I have the honour to Report on the Water Works as follows: The Reservoir, Watchman's House and Stop-cock Vault, at Pokfulam are complete. The extra works performed at this station are principally accounted for by the fact that the waste weir of the dam as originally constructed was too small to carry the waste water in cases of very heavy rains, and it was therefore deemed necessary to lay the whole surface of the top of the dam with granite, and to build on top of that high skirting walls to allow the waste to pass off freely without the probability of doing any damage in future. The Tank above Bonham Road may be said to be complete with the exception of asphalting the bottom, the fixing of ventilators and sink stones in the crowns of the covering arches, and the fitting of doors and windows to the small houses in front. The Tank above Taipingshan is also completed with a capacity of 850,000 Gallons, with the exception of cementing and asphalting the bottom, the fixing of ventilators and sink stones in the crowns of the covering arches, and the fitting of doors and windows to the top lock House and Workshops in front. The extra works on the site of the upper Tank were unavoidable, as the site originally proposed was not suitable, and it was found necessary to build a considerable quantity of extra retaining and other walls. Page 158
Baseline (Original)
P. SURVEYOR GENERAL'S of Victoria, Houghong, with service for providing the city extending and completing the ESTIMATE OF THE EXPENSE FOR water. $ 35,322.01 Victoria, 27th July, 1863. REPORT AND ESTIMATE Supplementary No. of 1863. } thou The Howle bhas St Geo: Cleverly Hongkong, 15th Surveyor General, to je je Works at Pokefulum. ·Tank to contain €200.000 Gallono. Tank to contain Liv. 158 15th April 1863. I have the horror to Report Water Worko". ao follows- on the 'tongdong The Reservoir. Watchman's House and Stop book Vault, at Pokefuluno are! Pokefulum may be said to be complete. The extra works performed at this station principally accounted for by the fact that the waste weir of the dam as originally constinded was to be too small to carry frund, LUG. the waste water in cases of very heavy rains, and it was therefore deemed necessary 1 granite, to lay the whole surface of the top of the damn with and to build on top of that high skirting walls to allow the waste to pass off freely without the probability of doing any damage in future. so as The Tank above Ronham Road may be said. to be complete with the exception of asphalting the bottom, the fixing of ventilators and sink stōneo in the crowns of the covering anches, and the fitting of doors and windows to the small houses in front. The Tank above Taipingshan is also completed 850,000 Gallons with the exception of cementing and nephalting the bottom, the fixing of ventilators and sink stones the crowns of the covering arches, and the fitting of doors and windows to I top bock House and Workshofto in front. in thestar mavoidable, the extra works on the site of the upper Tank not being were A the one originally proposed it was found resepary to build a considerable quantity of extra retaining and other
2026-05-19 00:38:26 · Baseline
View content

P.

SURVEYOR GENERAL'S

of Victoria, Houghong, with

service for providing the city extending and completing the

ESTIMATE OF THE EXPENSE FOR

water.

$ 35,322.01

Victoria, 27th July, 1863.

REPORT AND ESTIMATE

Supplementary

No. of 1863.

}

thou

The Howle

bhas St Geo: Cleverly

Hongkong, 15th

Surveyor General, to je je

Works at Pokefulum.

·Tank to contain

€200.000 Gallono.

Tank to contain

Liv.

158

15th April 1863.

I have the horror to Report

Water Worko".

ao

follows-

on the 'tongdong

The Reservoir. Watchman's House and Stop book Vault, at Pokefuluno

are!

Pokefulum may be said to be complete. The extra works performed at this station principally accounted for by the fact that the waste weir of the dam as

originally constinded was to be too small to carry

frund,

LUG.

the waste water in cases

of very heavy rains, and it was

therefore deemed necessary

1

granite,

to lay the whole surface of the top of the damn with and to build on top of that high skirting walls to allow the waste to pass off freely without the probability of doing any damage in future.

so as

The Tank above Ronham Road may be said. to be complete with the exception of asphalting the bottom, the fixing of ventilators and sink stōneo in the crowns of the covering anches, and the fitting of doors and windows to the small houses in front. The Tank above Taipingshan is also completed 850,000 Gallons with the exception of cementing and nephalting the

bottom, the fixing of ventilators and sink stones the crowns of the covering arches, and the fitting of doors and windows to I top bock House and Workshofto in front.

in

thestar mavoidable,

the extra works on the site of the upper Tank not being

were

A

the

one

originally proposed it was found resepary to build a considerable quantity of extra retaining and

other